How do I copy a schedule from one Revit file to another?

How do I move a schedule from one Revit model to another?

Use a Schedule in Another Model

  1. Click Insert tab Import panel Insert from File drop-down Insert Views from File.
  2. Select a Revit project that contains the views to insert, and click Open. …
  3. Select the views to display from the list.
  4. Check the views you would like to insert, and click OK.

How do you duplicate a schedule in Revit?

Duplicate a Schedule

  1. Right-Click the schedule name in the Project Browser.
  2. In the context menu select Duplicate. Note: If the schedule has been split across sheets into segments, an additional selection will be available, Duplicate with Segments. This will duplicate the schedule and retain the segments created.

How do you link a schedule in Revit?

Include Elements from Linked Models in a Schedule

  1. Open the schedule in the host project.
  2. On the Properties palette, for Fields, click Edit.
  3. Select Include elements in links. …
  4. To include project information from a linked model, for Select Available Fields From, select Project Information.

Can you copy and paste between Revit models?

Elements from linked Revit models can be copied to the clipboard and then pasted into the host model. … Alternatively, you can click Modify tab Clipboard panel Paste drop-down Aligned to Same Place to paste the element into the same place from where you copied it.

IT IS INTERESTING:  How do I add a parameter to a Solidworks drawing?

How do I import a Revit schedule into Excel?

How to export schedule data from Revit to Excel

  1. Go to the Application menu (big R in top left) or the File menu in Revit 2018 and later releases.
  2. Select Export.
  3. Scroll down the list until you come to Reports > Schedule.
  4. This will then export a *. txt file.
  5. Import this *. txt file into Microsoft Excel.

How do you split a sheet index in Revit?

These versions of Revit do not have a feature to split a schedule between multiple sheets.

Follow these steps:

  1. Place the schedule onto the first sheet.
  2. Select the schedule from the sheet.
  3. Adjust it using the split icon on the side and the drag points at the column ends.

How do I create a design option in Revit?

Setup a Design Option

  1. On the Manage tab within Revit, select the Design Option button.
  2. Select the New button under Design Option Set to create a new option set called “Option Set 1”. …
  3. Select the New button under Option to create a new option called Option 2.
  4. Close the Design Option dialog.