How do you change project level in Revit?

How do you change the reference level in Revit?

Well we do have another option and its quite simple really, first select the beam, then on the Ribbon use Edit Work Plane. This will show the Work Plane dialog box, using the ‘Name’ option dropdown select a different work plane and the beam will move to that work plane and the ref level will now match.

How do I change the elevation of a building in Revit?

Change Elevations for a Site Element

  1. Open a site plan that displays the site element to modify. …
  2. Click Site Designer tab Modify panel, and click the tool for the element to modify.
  3. In the view, select the host line for the site element to modify. …
  4. In the Modify dialog, click Change Elevation. …
  5. Make the desired changes:

How do I change the elevation of a survey in Revit?

Move the Survey Point

  1. In the site plan view or another view that displays the survey point, select the survey point.
  2. Click the clip to change its state to clipped or unclipped, depending on how you want to move the survey point. …
  3. Drag the survey point to the desired location.
IT IS INTERESTING:  Is ArchiCAD the best?

How do you change the level of a family in Revit?

Right click on any word in your Project Browser to do a Search… for the name of your Level Head Family. Once you have found it, right click on the Family, and Select “Edit”. This will open up the Family Editor and allows you to edit the Annotation Family.

How do you change the level dimension in Revit?

You can change level lines in the following ways:

  1. Resize level lines. Select the level line, click on the blue sizing handles, and drag the cursor left or right.
  2. Raise or lower levels. Select the level line, and click the dimension value associated with it. …
  3. Re-label the level. Select the level and click the label box.

How do you set a project base point in Revit?

To select the project base point, move the cursor over the symbol and look at the tooltip or the status bar. If it says Site: Survey Point, press Tab until it says Site: Project Base Point. Click to select the project base point. Drag the project base point to the desired location.

How do you set a project base point and survey point in Revit?

To make these points visible:

  1. Click View tab > Graphics panel > Visibility/Graphics.
  2. On the Model Categories tab of the Visibility/Graphics dialog, scroll down to Site. …
  3. To display the project base point, select Project Base Point.
  4. To display the survey point, select Survey Point.

How do you change the project base in Revit 2020?

After initially defining coordinates for the project base point, you can move it later if needed. In the site plan view or another view that displays the project base point, select the project base point. Drag the project base point to the desired location.